Clients & Projects

King City, ON

King City Municipal Centre

The new centre will bring all the township staff together under one roof for the first time, including a York Regional Police (YRP) substation.  It aims to provide more than administrative ease to the community, but also aims to become a community hub, with a 6,000 sf multi-use gymnasium/event space available for public use.  Sustainability features include a geothermal heating and cooling loop system, and sustainable building materials.  Targeting LEED Gold Certification.

HVAC systems consist of a Ground source geothermal system, water to air heat pumps, energy recovery ventilators, domestic hot water system, and miscellaneous fans. Electrical systems consist of a low voltage lighting control system with occupancy sensors. The building has full DDC system controlling the major mechanical equipment and common areas, and local controls for suite mechanical equipment.

Services provided by CFMS:

·         Contract document review

·         Preparation of mechanical and electrical test forms manuals

·         Commissioning coordination

·         Installation review from a commissioning prospective

·         Witnessing static and dynamic contractor tests

·         Verification of DDC system and BAS

·         100% performance testing of HVAC, lighting control systems & emergency power system

·         Review of operation and maintenance manuals

·         Co-ordination of mechanical & electrical equipment and systems training

·         Seasonal performance testing of HVAC systems.

Why Commissioning