The GO East Gwillimbury Bus Facility is a new 65,500 square foot building providing administration space and bus facilities for GO Transit. The majority of the building houses a vehicle area which includes a bus fueling area, bus wash bay, service/maintenance bay, vehicle circulation area and indoor/outdoor vehicle storage areas. The administration area of the building includes administration offices, lunch room, workshop, fitness area, locker room, storage areas and an IT/Data room. The project achieved LEED Gold certification.

Services provided by CFMS:

  • Complete LEED fundamental (EAp1) and enhanced (EAc3) commissioning
  • Drawing and specification reviews during design stage
  • Mechanical / lighting control systems installation reviews
  • Commissioning co-ordination
  • Verification of DDC system and BAS
  • Functional verification of mechanical and lighting control systems
  • Co-ordination of mechanical and electrical equipment and systems training
  • Preparation and presentation of systems re-commissioning manual
  • Seasonal performance testing of HVAC systems

Preparation and turnover of final commissioning report

  • Commissioned systems include for:
  • Central hot water heating plant
  • In-slab heating systems
  • Air handling systems – Make-up air units, Rooftop units, Heat recovery units
  • Garage CO and NOx systems
  • Humidification systems
  • Domestic hot water system
  • Non-potable cistern system
  • Miscellaneous heating systems
  • Miscellaneous exhaust fan systems
  • Split A/C systems
  • Lighting control system