Clients & Projects

Sagamok Anishnawbek First Nation, ON

New Sagamok Biidaaban Elementary School

This new K-8 school includes a full-size gymnasium in the school, a cafeteria, a science room and a library.  Located next to the Elders Lodge, it enables educational experiences and relationship building within the community.

HVAC systems consist of boiler hot water heating, a propane fired humidifier, heating glycol, a dry cooler, domestic hot water, domestic booster pumps, a rooftop air handling unit with heating and cooling, energy recovery ventilators with heating coils, a rooftop ventilator interlocked with kitchen exhaust system and a makeup air unit, individual room heat pumps, VAV boxes, exhaust fans and miscellaneous / mechanical area heating utilizing unit heaters and cabinet heaters. The building systems are under the control of the newly installed building automation system. In addition to mechanical controls, the building also includes a lighting control system and photocells to control exterior lighting.

Services provided by CFMS:

·       Installation review from a commissioning perspective

·       Compile record of static tests

·       Compile record of dynamic contractor tests

·       Pre-functional equipment inspections

·       Verification of DDC system and BAS

·       100% performance testing of HVAC systems

·       Review of final balancing report

·       Review of O&M manual

·       Co-ordination of mechanical equipment and systems training, including video-recording

·       Seasonal performance testing of HVAC systems

Why Commissioning