The twin pad arena will have two Olympic-sized ice rinks, meeting rooms, a walking track, a small gymnasium, and a 20,000-square-foot public library, complete with a children's area, gaming zone, study rooms, a learning lab and a digital lab.
HVAC systems installed include a hot water heating plant, glycol heating systems, domestic hot water plant, variable volume rooftop units, in-floor heating, split A/C units, exhaust fans and miscellaneous cabinet and unit heaters. The building has full DDC control down to and including the individual spaces.
Electrical systems installed include electrical distribution, emergency generator and distribution, and low voltage lighting control system.
Services provided by CFMS:
· Contract document review
· Mechanical and electrical commissioning coordination
· Installation reviews from a commissioning perspective
· Witnessing static and dynamic contractor tests
· Verification of DDC system and BAS
· Verification of lighting control system
· 100% performance testing of major HVAC systems and spot checking on terminal devices
· Co-ordination of mechanical and electrical equipment and systems training
· Seasonal performance testing of HVAC systems.